Jiangyin Jinyu Packaging Materials Co., Ltd.

Email: dhl153@foxmail.com

Factory: +86 188 616 55733

2K PU foam-in-place compound

Two-component PU foam-in-place sealing material for programmable industrial gasket paths and room-temperature reaction.

2K PU COMPOUND

PU foam-in-place sealing compound

Polyol and MDI components are metered and mixed on demand to form a seamless gasket without an oven.

PU foam-in-place sealing compound

TYPICAL DATA

Cured gasket properties

Property Catalog value
Appearance Black; custom grey or other colors
Gel time 55-60 seconds at 23 C / 60% RH
Tack-free time 20 minutes
Full cure 2 hours
Hardness 45-70 Shore 00
Foam density 280-350 kg/m3
Long-term temperature -30 to 80 C
Short-term temperature Up to 120 C

FOAM-IN-PLACE MATERIAL

2K PU compound for room-temperature gasket formation

Two-component PU forms a gasket when separately conditioned components are accurately metered, dynamically mixed and dispensed along the programmed path. The material reacts at room temperature, so the process does not depend on a PVC curing oven.

Stable output requires controlled component temperature, the approved mixing ratio, repeatable metering and a defined cleaning cycle. The final bead should be checked after the specified reaction and conditioning period for continuity, adhesion, cell structure and compression.

Material supply Separate polyol and isocyanate components
Gasket formation Metered, dynamically mixed bead
Curing method Room-temperature reaction
Typical process fit Programmable industrial lids and enclosure gasket paths
Critical controls Conditioning, ratio, output, mixing and cleaning

Approval before production

The values above are selection references, not a release specification. Final dimensions and performance must be confirmed with the actual lid, closing process and filled medium.

Details